SunSirs--China Commodity Data Group

Member ID: password: Join Now!
Commodity News

SunSirs: Some Domestic BDO Enterprises will be Repaired Soon on February 13

February 13 2025 15:09:44     

The first phase of Shaanxi BDO BDO was stopped in early August 2024, and the restart time was not determined; the second phase of the 100,000 tons/year device was operating stably, and parking expectations remained in the near future.

Shaanxi Guorong 60,000 tons/year BDO device was stopped in mid-April 2024, and the restart time is not yet determined.

The production line of Xinjiang Meike Chemical Phase 1, 60,000 tons/year, 100,000 tons/year, and 100,000 tons/year in phase 4 was relatively stable. The 100,000 tons/year in phase 3 was parked, and there was no quotation in spot stock.

Xinjiang Tianye's 210,000 tons/annual capacity BDO devices were all stopped at the end of September, and the restart time was not determined.

Henan Energy Hebi Coal Chemical 100,000 tons/year BDO device, the entire factory was suspended for inspection on July 10, 2024, and the restart time is not yet determined.

Henan Kaixiang's 110,000-ton BDO device was all stopped on February 5, and the restart time has not been determined. It mainly supplies downstream PBT, PBAT and other self-use and contracts, and there is no quotation in spot stock.

Inner Mongolia Huaheng has three sets of 104,000 tons of BDO devices each. One of them is in the parking space and two sets of devices operate stably.

The 300,000-ton BDO device of the first phase of Dalian Hengli is being parked; the 300,000-ton BDO device of the second phase of Dalian Hengli has produced qualified products, with a load of around 50%, mainly for self-use.

Sichuan Wanhua's annual output of 60,000 tons will be installed on December 10, 2024. The BDO and downstream products will be suspended for maintenance and will be restarted near January 10.

The load of two 3D sets of 150,000 tons per year in Inner Mongolia has a capacity of 60-70%.

Xinjiang Xinye Phase 1, 60,000 tons/year, and 70,000 tons/year BDO device with a line in the second phase is operating at 80% of the load. The second 70,000 tons device in the second phase is being debugged, and driving is being prepared.

area

Device dynamics

Shaanxi Shaanxi Chemical

Phase I stopped in early August 2024, and the restart time has not been determined; Phase II operates stably

Shaanxi Guorong

The 60,000 tons/year BDO device was stopped in mid-April 2024, and the restart time is uncertain

Xinjiang Meike

The third phase device is stopped, and the first phase device is operated normally

Xinjiang Tianye

210,000 tons/annual capacity BDO device device is being parked

Dalian Hengli

Phase 1 is being parked, Phase 2 is running stably

Henan Energy Chemical Industry

The factory was suspended for major inspection on July 10, and the restart time was not yet determined

Henan Kaixiang

All 110,000 tons of BDO devices were stopped on February 5, and the restart time was not determined

Inner Mongolia Huaheng

Three sets of 104,000 tons of BDO devices each, one of which is in the parking space, and two sets of devices operate stably

Xinjiang Cathay Pacific

One set of stable operation; one set of devices was repaired on December 14, 2024, and has been restarted and stable operation

If you have any enquiries or purchasing needs, please feel free to contact SunSirs with support@sunsirs.com.

Related Information
Energy
Chemical
Rubber & plastics
ABS | BR | EVA | HDPE | LDPE | LLDPE | Natural rubber | PA6 | PA66 | PC | PET | PP(Drawing) | PS | PVC | SBR |
Textile
Non-ferrous metals
Steel
Building materials
Agricultural & sideline products